Case
Histo
ries
Having been contacted by a Grade II Listed Building to
provide an alternatie communal solution to the present
analogue-only
terrestrial channels, New Vision TV worked closely with the
residents of this self-managed block to address the Planning
issues.
We met with the area representative for Historic Buildings to
understand their objectives. Dish visibility proved to be less of
a concern than the impact of cabling on the external
elevations. Indeed the legacy implications which would flow
from future changes in communal television technology was
given the greatest prominence
The living rooms for the nineteen flats in this Listed Building faced from
all four elevations. There were no vertical risers inside
the building to conceal cables. Trunking around stairwells or within
corridors would not be in keeping. The network therefore had
to be run externally to bring the satellite signals to the living room of
every apartment.
In practice, we installed the signal reception equipment at roof
level one a month before the Falcon’s annual visit. Although our
design approach minimised the external facilities we still require
rooftop access to maintain
the communal dish and aerial.
This floor-to-floor cabling through the block is run within the riser by the
lift which is at the end of each of the twenty-four floors. The cables to
each flat are contained behind coving which we fitted on both sides of
every corridor.
Having been contacted by a Grade II Listed Building to provide
an alternative communal solution to the present analogue-only
terrestrial channels, New Vision TV worked closely with the
residents of this self-managed block to address the Planning
issues. To overcome the visual reservations about cabling,
New Vision TV utilised fibre optic technology. Horizontal runs
were largely concealed within the basement storage areas and
vertical runs were designed to take advantage of the contours
of the building.